Once you have selected all of your personal choices for your new Grand Home, your home plan is prepared by our in-house CAD staff and submitted to a structural engineer for foundation design. The Purchasing team buys materials to build your home. A “start package” is issued to your builder for review and submitted for a building permit. Next is a meeting with your builder to go over blueprints and the construction process.

Construction

Each stage takes approximately two weeks.

Stage 1

Your home site is cleared and prepped for pouring the foundation. Forms are set and plumbing rough is completed. Inspection by city officials, engineer, and Grand Homes Quality Control Team.

Stage 2

Foundation is now poured.

Framework is completed.

Stage 3

Rafters are installed to complete the frame.

Stage 4

Decking, cornice, and windows are installed. Mechanical roughs are completed including plumbing “top-out” and HVAC rough.

Roof and vents are added along with skylights if applicable.

Stage 5

Additional mechanical roughs are installed which include electric rough and security rough. Gas lines are installed. Now, City Inspectors and the Grand Homes Quality Control Team do framing and mechanical inspections.

Stage 6

Brickwork begins and insulation is installed.

Pre-sheetrock Inspection:A pre-sheetrock inspection with you, your builder, and your sales associate now occurs. The inspection and review will cover the entire structure, including placement of electrical plugs and switches, cable television outlets, telephone outlets, color selections, and any changes you requested to the plan. The pre-sheetrock inspection is critical to insure that the timely completion of your home is not delayed due to incorrect installation or misinterpretation of your changes.

After pre-sheetrock inspections are complete, sheetrock installation begins and is followed by the taping, bedding, and texturing of the walls. The flatwork, which includes driveways, sidewalks, and patios, is installed.

Stage 7

At this stage, exterior painting is done. Finish carpentry that includes stair trim out, cabinets, countertops, trim, doors, and mantles is completed. Baths and backsplash are tiled.

Stage 8

Wall out and trim prep inspection is completed. Interior walls and trim are painted. Vanities are now installed. HVAC and plumbing trim out is done.

Stage 9

Electrical and security trim out is completed. Wallpaper is now installed as well as mirrors and shower doors. Back yard fence is installed and final survey is completed.

Stage 10

The floors are laid and fireplaces are tiled. Trim hardware and locks are installed. Landscaping and irrigation are completed. Any touch-up work to the paint is done and there is a pre-carpet inspection. Once approved, the carpet is installed. Final clean of the interior and exterior is done and appliances are checked for any defects.

Stage 11

Gas and electric meters are installed. A final building inspection is completed and your home is now ready for your Homeowner Orientation. Any item that you believe needs our attention can be identified at your Homeowner Orientation.

Completed Home

It is our goal to have your home fully complete prior to closing. Once we have completed the remaining items from your Homeowner Orientation, your home is cleaned once again and ready for move in!

Act Now for the Grand New Home Ownership Experience.













Find a Home
available now
Location Search
Plan Search
Price Search
*
Community Locator Map
Online Community Advisor
Hot Homes Ready Now!Communities
*
Tour The Models
My Favorites
*
buyer's guide
financing
tax benefit analysis
buying steps
*
Check out our Promotions! Flexible Functional lifeSpaces by Grand Homes
*
 
 
equal housing opportunity